After graduation, my first job was in Hong Kong construction. As an AE in the Tender department.
Facing English contracts, thick Specifications, dense Drawings - I was a blank sheet.

Learning Taking-off

First thing: learn Taking-off (quantity surveying). Row by row in Excel, extracting numbers from drawings.
The logic had to be perfect. One wrong number could throw off the entire estimate.

The Colleagues

I was lucky. My Hong Kong colleagues were incredibly patient. They taught me rates, contract pitfalls, and even took me to local tea restaurants.
During tender season, we worked late together. The bond formed under pressure is real.

What I Gained

Those six months in Tender taught me the foundation of Hong Kong construction. Without that experience, I couldnt have understood the site work that came later.
Grateful to those mentors who guided a newcomer into the industry.
First job: Hong Kong construction. AE in Tender department.
English contracts, thick Specifications, dense Drawings - blank sheet.

Learning Taking-off

First: learn Taking-off. Row by row in Excel. Logic must be perfect.

Colleagues

Hong Kong colleagues: incredibly patient. Taught rates, contracts, took me to tea restaurants.
Working late together under pressure = real bond.

What I Gained

Six months in Tender = foundation of HK construction. Without it, couldnt understand site work.
Grateful to mentors who guided a newcomer.
First job: HK construction. AE Tender.
English contracts, thick Specs, dense Drawings. Blank sheet.

Learning Taking-off

First: Taking-off. Row by row Excel. Logic perfect.

Colleagues

HK colleagues: incredibly patient. Rates, contracts, tea restaurants.
Late work together under pressure = real bond.

Gains

Six months Tender = HK construction foundation. Without it, no site work.
Grateful to mentors guiding newcomer.
First job: HK construction. AE Tender.
English contracts, thick Specs, dense Drawings. Blank sheet.

Learning Taking-off

First: Taking-off. Row by row Excel. Logic perfect.

Colleagues

HK colleagues: patient. Rates, contracts, tea restaurants.
Late work together = real bond.

Gains

Six months Tender = HK construction foundation.
Grateful to mentors guiding newcomer.
First job: HK construction. AE Tender.
English contracts, thick Specs, dense Drawings. Blank sheet.

Learning Taking-off

First: Taking-off. Row by row Excel. Logic perfect.

Colleagues

HK colleagues: patient. Rates, contracts, tea restaurants.
Late work together = real bond.

Gains

Six months Tender = HK construction foundation.
Grateful to mentors guiding newcomer.
Refusing to Be a Site Typist: Automating RFI with PythonMissing My Hong Kong Construction Colleagues
Loading...
© 2023 - 2026 Michael Zhang.Building Order in a World of Entropy